Design & Built CBP 800mm & 1000mm dia, Strutting, Steel Decking & Earthwork for 13m Deep Excavation Basement


Project Info

Completion
June 2022
Scope
Desgin & Built permanent shoring wall to replace temporary shoring
Client
KKH Development Sdn Bhd

Cadangan Membina Pangsapuri 65 Tingkat di atas Lot 531 & Lot 568, Seksyen 57, Jalan Berangan Off Jalan Sultan Ismail, Bandar Kuala Lumpur, Wilayah Persekutuaan Kuala Lumpur

Needs: Client want to do temporary sheet pile shoring for 16m excavation deep building tower foundation & basement wall

Problem: Based on the soil investigation report, temporary sheet pile shoring only can be done using toe shoftening method which is expansive & time consuming.

Solution: we propose 800mm & 1000mm dia permanent CBP wall with steel structing system to overcome.